Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM04952
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/01/2022 | MGAYOSS1 | DESIGN PROFESSIONAL | REVIEW | Completed | This will be a modification to the approved design package (available in PRO under T21SA00082) that will required PRS and DRB review. Could you please include in your design package: 1. In Project Statement (PDF page 6), please list the changes that are now being proposed, and why the changes; 2. Include the previously approved design package, and cloud/redline the areas where the changes are being proposed. Are there are changes to the north facade? Is the outdoor seating area still planned? If not, please make sure to indicate it. Once I receive the items above, I can forward them to the Historic Preservation Officer to make sure everything needed for historic review has been included, and to see if she has any preliminary comments. Thanks. |
07/05/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/05/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/21/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
07/25/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
07/25/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Demonstrate energy code compliance for the alteration to the building envelope using calculations based on the current code (e.g. U-Value and SHGC for new fenestration). Reference: Sections C503.1 and C503.3.2, International Energy Conservation Code 2018. |
07/25/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/26/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
08/02/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
08/13/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Activity Number: T22CM04952 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. Denied New guardrail is required to be in accordance with IBC 1015. Specify the height, and clear space between railing. Provide structural calculations for required loads to guard rails of 50 lb. PLF, 200 lb. concentrated; Specify method of attachment of guardrails to rough-opening and deck. IBC 1607.8.1. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |