Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM04948
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/12/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04948 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Structural Calculations for New Platform Structural Steel members per Section 1601.1 of International Building Code 2018. 2. Verify the Floor Slab adequacy to support the Point Loads from new structural columns supported on existing slabs. 3. Verify the adequacy of Existing Structural Steel Members and Steel Joists to support the new platform loadings. 4. Provide Seismic Calculations for the Building with these additional loadings of new platform per Section 1613 of International Building Code 2018. 5. The steel joists would need reinforcing if the point loads are off panel points. Provide details for the reinforcing. 6. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Denied 1. Provide a brief narrative on the extent of the work being completed. 2. Update and provide existing occupant loads. MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Denied 1. Sheet E102: Indicate branch circuit number / panelboard for new light fixtures. 2. Sheet E102: Indicate wire size to be used for new lighting and receptacles branch circuits. 3. Sheet E601: Provide voltage drop calculation for new receptacles and lighting branch circuits circuits to comply with 2018 IECC, C405.9. 4. Sheet E102: Show means of egress emergency illumination. 2018 IBC 1008.3 and 1008.3.5. 5. Sheet E102: Show location and controls for light fixtures. PLUMBING REVIEW COMMENTS: Conditionally Approved No Plumbing or gas work shown= N/A If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
07/19/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
07/19/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
07/19/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
08/02/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
08/15/2022 | JPEELDA1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/15/2022 | VVERA1 | OUT TO CUSTOMER | Completed |