Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T22CM04784
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/24/2022 | RPARSON1 | OIP | REVIEW | Completed | |
| 07/01/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04784 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Plans do not include deadload calculations reviewed by a licensed structural engineer. 2018 IRC - 301.1. The project involves adding additional loads to an engineered truss system, which requires a structural engineer to evaluate. BUILDING REVIEW COMMENTS: Denied 1. Missing information to determine ridge setback. 2018 IFC - 1204.2.1.2. The plans do not show if the PV system takes up more than 33% of the roof area. If more than 33% of area is displaced by the PV system, a minimum 3' setback from the ridge is required. MECHANICAL REVIEW COMMENTS: N/A ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: N/A If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/01/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |