Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM04680
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/22/2022 | WBERGER1 | ZONING | REVIEW | Approved | |
06/22/2022 | WBERGER1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/06/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
07/06/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
07/06/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/13/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
07/18/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Ref; Plan Sheets, AD.2, AD1.0, A1.1. Floor plans and plan notes. These plans call for relocating electrical equipment, New Electrical, re-installing or re-locating luminaires (light fixtures) including exit fixtures with battery back-up. Please provide complete electrical power and lighting plans showing all new and or relocated electrical devices, assigned branch circuiting and panel designations, Panel schedules, Load calculations for the “New Electrical”. Plans to be sealed by a registrant registered in the State of Arizona. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
08/04/2022 | JGARCIA1 | BUILDING-COMMERCIAL | REVIEW | Completed | |
08/11/2022 | SCABRAL1 | ENGINEERING | REVIEW | Passed |