Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM04490
Parcel: 128120850

Address:
4925 E 17TH ST

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T22CM04490
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/28/2022 WBERGER1 ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Wyatt Berger
Planner

PROJECT: T22CM04490
4925 E 17th St
Single Family Residence (1st Review)

TRANSMITTAL DATE: June 28, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. Correct the adjacent zoning to R-1.

2. Provide building heights, measured from design grade to the highest point of the proposed exterior building walls, on the elevations.

3. Per UDC Table 6.3.2-A, the required side and rear perimeter yard setbacks are the greater of 6'-0" or 2/3 the height of the proposed exterior building wall. Based on an estimated wall height of 17'-6", the required rear yard setback to the north lot line is 11'-8". Demonstrate that the rear yard setback is being met in your next submittal.

4. Per UDC 6.4.5.C, the required front street perimeter yard setback is the greater of 20'-0" or 1 ½ times the height of the proposed exterior building wall. Based on an estimated wall height of 17'-6", the required front street setback to the south lot line is 22'-0"; proposed is 21'-0".

A DDO must be submitted and approved to reduce the required setbacks. The DDO application and its requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. The DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type "Zoning Administration." Please contact Mark Castro at Mark.Castro@tucsonaz.gov if you have questions about the DDO application or process.

If you have any questions about this transmittal, please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or at 520-837-4951.
06/28/2022 WBERGER1 ENGINEERING REVIEW Passed
06/28/2022 WBERGER1 NPPO REVIEW Passed
07/13/2022 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T22CM04490
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL COMMENTS:

1. A dwelling unit (living space with kitchen) providing complete independent living facilities requires compliance with design ordinances for handicap, solar water, photo-voltaic, gray water and EV charging preparations. Design Ordinances adopted by the City of Tucson.
2. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation.
3. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 .
a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces.
b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker space location.
4. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. See details for compliance at https://www.tucsonaz.gov/pdsd/water-energy-conservation
5. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space or show the distance from transit or a bike boulevard as not greater than a quarter-mile.

PLANS:

1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route.
2. Provide manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona, or notate the requirement for deferred submittal, R106.1.
3. Identify each wall line needed for enclosing a complete rectangle with sides no greater than 60’, Figure R602.10.1.1. Place these lines no further than 4’ from an actual parallel wall, so that corners are no further than 10’ from a “qualifying” braced wall panel.
4. Show interior braced wall panels with foundation anchor bolt connection to bottom plates, R602.10.8.3 and R403.1.6.

SECTIONS - DETAILS:

1. Clarify the placement of ceiling/roof insulation for determining the need for attic ventilation or need for providing air-impermeable rigid insulation at the roof, R806.
2. Show an unvented roof assembly with all insulation at the roof including an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing as part of the total insulation requirement, R806.5 or show the attic vent opening size using 1 to 150 of attic area with insulation at the ceiling in compliance with R806.2.

MECHANICAL PLANS:

1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation, or controlled exhaust with a calculated airflow rate, R303.4; N1103.6 & M1505.4. Show the system and appropriate flow rate setting on the plans. A two or three bedroom dwelling under 1501 SF requires a 45 CFM continuous setting.
2. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical plans if system calculations will be provided by deferred submittal.

ELECTRICAL PLANS:

1. Show or notate the requirement for a carbon monoxide detector outside of bedroom doors, when the dwelling includes an attached garage or gas appliance, R315.
2. Garage Branch Circuit: a separate (dedicated) GFCI 20-amp branch circuit required for receptacles in an attached garage and detached garages with service, E3703.5. Replace circuit #17 at the rear porch.
3. Garage Receptacle Location: a 20 AMP receptacle outlet is required at each vehicle bay not more than 5.5 feet above the floor, E3901.9.
4. Clothes Washer and Dishwasher GFCI: receptacles require readily accessible protection typically from an upstream device, E3902.9 & 10. Add notation to plans.
5. Specify high-efficacy lamps for at least 90% of all lighting fixtures, N1104.1. Update note #6.
6. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready” and locate the receptacle at a parking area, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2.

OUTDOOR LIGHTING CODE

1. Show the proposed fixture as full cut-off FCO style or provide an Outdoor Lighting Calculation including all exterior fixtures on the property for determining exterior lighting limits.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
(520) 837-4912 PDSD-Residential@tucsonaz.gov