Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM04464
Parcel: 13623008G

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM04464
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/28/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.
2. Update the General Plumbing Notes: we do not use the 2012 UPC.
06/28/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Show that the proposed heat pump meets the requirements of Sections C403.3, C403.4, and C403.5 (e.g. provide the mechanical compliance certification from COMcheck). Reference: Section C501.4, International Energy Conservation Code 2018.
2. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified heat pump. Reference: Section C403.1.1 and C502.2.3, IECC 2018.
3. Verify that the parapet height within ten feet of the new heat pump is at least 42" above the walking surface of the roof or provide guards for the heat pump per Section 304.11, IMC 2018.
4. Show the size, routing, and termination of the condensate drain from the new heat pump. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson.
5. Provide calculations to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018.
06/28/2022 ROBERT SHERRY WATER REVIEW Completed
07/06/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

1. Provide compliance with the 2018 IECC for the lighting.

2. Indicate circuit numbers, OCPD’s, and panel designation.

3. Provide a complete panel schedule including panel load calculations and show the location of the breaker panel.

4. Verify that there is a 120volt maintenance receptacle provided on the roof for the new rooftop unit. NEC 210.

Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
07/09/2022 JVINCEN1 FIRE REVIEW Approved
07/11/2022 STEVE SHIELDS ZONING REVIEW Approved
07/11/2022 SSHIELD1 ENGINEERING REVIEW Passed
07/11/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
08/04/2022 WILDAN BUILDING-COMMERCIAL REVIEW Completed