Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM04458
Parcel: 13106007A

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM04458
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/22/2022 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
06/28/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Completed
06/28/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Revise the plumbing schematic to reflect the waste and vent piping configuration shown on the plumbing floor plan. Reference: Section 107.2.1, IBC 2018.
2. Verify if an existing grease interceptor is currently in place to prevent the discharge of fats, oil, and grease into the public sewer. If a grease interceptor is not in place, show how the public sewer is to be protected from harmful discharges. Reference: Section 1003.1, IPC 2018.
06/28/2022 ROBERT SHERRY WATER REVIEW Completed
07/05/2022 STEVE SHIELDS ZONING REVIEW Approved
07/05/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/13/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
07/19/2022 PCAMARE1 ENGINEERING REVIEW Approved This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp.
Instructions:
• Is this for a new or existing activity application? – Please select New Application.

• Submission Type – Select Floodplain Use Permit.

• Project Name – Enter a name for your project.

• Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided.

• Type of Permit – Select Commercial or Residential (Residential is for work on single family residences and duplexes.)

• Complete the Applicant Info.
• Complete the Contractor, Owner and Architect/Engineer sections as applicable.

• Supporting Documentation Upload – Provide a complete cost estimate for the project. You may also provide additional documents you think will be helpful.

• Sign the application and submit.

• You will be given an activity number for your submittal. Please copy and send this number back to us so we can continue the review.
07/22/2022 JVINCEN1 FIRE REVIEW Approved