Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM04440
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/22/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 06/27/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 06/27/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide cleanouts for all horizontal drains and an additional cleanout for each 40-foot section of drains having a change of direction greater than 45 degrees. The cleanouts shall be sized per Section 708.1.7, IPC 2018 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.1.1 and 708.1.8, IPC 2018. 2. Show the existing building drains to verify that the new combination drain and vent pipes are properly sized per Table 915.2.2, IPC 2018. 3. Verify if an existing grease interceptor is currently in place to prevent the discharge of fats, oil, and grease into the public sewer. If a grease interceptor is not in place, show how the public sewer is to be protected from harmful discharges. Reference: Section 1003.1, IPC 2018. |
| 06/27/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/30/2022 | PCAMARE1 | ENGINEERING | REVIEW | Passed | |
| 07/06/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Ref; Plan Sheet E3. There is no existing load calculation shown for existing panel ‘D’. Just total service load per APS. Perform load calculations for the 200 amp rated panel ‘D’ prior to adding the 75 amp load from new panel ‘K’. Measuring the load for panel ‘D’ after adding the load from new panel ‘K’ is not an approved code method. NEC art’s 215, 220, 240. See ‘ONE LINE KEYNOTE #2’. Or, provide an NEC code article that states measuring total load after adding new load to an existing AC system panelboard to verify it can support the load is an approved code method. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
| 07/08/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 07/08/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 07/21/2022 | JVINCEN1 | FIRE | REVIEW | Approved |