Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T22CM04315
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/15/2022 | RPARSON1 | OIP | REVIEW | Completed | |
| 08/30/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM04315 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide a lag bolt connection up-lift calculation demonstrating the wind load supporting capability, R301.1 (Wind speed is 115 MPH ) 2. Provide sufficient standoffs for achieving a point load calculation under 45 lbs R301.1 show calculation BUILDING REVIEW COMMENTS: Approved Installation of new PV system with 21 modules, battery backup system and associated equipment approved. MECHANICAL REVIEW COMMENTS: N/A ELECTRICAL REVIEW COMMENTS Denied 1. A load calculation is required to be provided for derated main service panel demonstrating sufficient service for 175 amp breaker. Provide Load calculation for all loads. 2, Provide specific location of all labels required by NEC 690 PLUMBING REVIEW COMMENTS: N/A If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/30/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |