Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM04234
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/07/2022 | VFLORES1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Reqs Change | Please provide a unit # needs to be assigned prior to issuance. You may contact Pima County addressing ph# 520-724-9512 Email: Addressing@pima.gov |
06/20/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/21/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Show the size, routing, and termination of the condensate drain for RTU-3. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. |
06/21/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 2. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. |
06/21/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/23/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. Show designated branch circuits and panels for all electrical devices, luminaires, mechanical equipment on the power and lighting plans. NEC 408.4 Indicate whether the loadcenters are new or existing and also any electrical appliances or equipment. Provide full compliance with the 2018 IECC for the lighting. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
06/29/2022 | WBERGER1 | ENGINEERING | REVIEW | Passed | |
06/29/2022 | WBERGER1 | ZONING | REVIEW | Approved | |
06/29/2022 | WBERGER1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
07/18/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Sheet G001 shows that the building has fire sprinklers but sheet G002 states that non are provided please clarify. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |