Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM04029
Parcel: 132165950

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM04029
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/10/2022 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
06/13/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change Spaces in which factory-built recirculating hoods tested in accordance with UL 710B are installed are considered to be kitchens and shall be ventilated per Section 403.3.1.1, IMC 2018. The minimum exhaust rate shall be 0.70 CFM per square foot, using a minimum area of 100 square feet for each individual cooking appliance (in this case the Unox oven and the Turbo Chef oven). Reference: Section 507.1, exception 2, IMC 2018.
06/13/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, 607.2, and 607.3, IPC 2018.
2. The developed length of the hot water supply piping from the new water heater to the new hand sink appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018 and C404.5, IECC 2018.
3. Clarify the installation of the relocated 3-compartment sink; changes in the plumbing code will apply to the new installation. See Sections 801 and 802, IPC 2018.
4. Verify if an existing grease interceptor is currently in place to prevent the discharge of fats, oil, and grease into the public sewer. If a grease interceptor is not in place, show how the public sewer is to be protected from harmful discharges. Reference: Section 1003.1, IPC 2018.
06/13/2022 JPEELDA1 FIRE REVIEW Approved
06/13/2022 ROBERT SHERRY WATER REVIEW Completed
06/21/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
06/22/2022 IMONSHI1 ENGINEERING REVIEW Passed
06/22/2022 IMONSHI1 ZONING REVIEW Approved
06/22/2022 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed