| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/01/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 06/07/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 06/09/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Verify the labels for the rooftop equipment; Two HP-1 units are shown on the mechanical floor plans on sheet M1. Reference: Section 107.2.1, IBC 2018. 2. Verify the outside air ventilation schedule. HP-1 is shown as supplying air to a shampoo area but only one room is identified as a shampoo area. Reference: Section 107.2.1, IBC 2018. |
| 06/09/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 06/09/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 06/15/2022 | GPENNIN1 | ZONING | REVIEW | Approved | |
| 06/16/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Provide a complete lighting and power plan. Reflected ceiling plan ‘A3’ shows new track lighting but no branch circuit designation or switching. The power plan ‘E1’ shows wall switches with no designations, a wall receptacle with no circuit number (south wall). Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. 2012 Tucson/Pima County Outdoor Lighting Code (OLC). |
| 06/28/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 06/28/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |