Permit Number: T22CM03915
Parcel: 122030320

Address:
4502 E SENECA ST

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T22CM03915
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/24/2022 WBERGER1 ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Wyatt Berger
Planner

PROJECT: T22CM03915
4502 E Seneca St
Patio Awning (1st Review)

TRANSMITTAL DATE: May 24, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. A plot plan for a zoning compliance review is required. Plot plan requirements can be found at this link here: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf.
2. A breezeway connecting the detached accessory structure to the principal structure appears to have been constructed around 2012 without a permit. Either provide permit documentation for the breezeway or include it within this scope of work.
3. A covered patio attached to the principal structure appears to have also been constructed around 2012 without a permit. Either provide permit documentation for the covered patio or include it within this scope of work.

If you have any questions about this transmittal, please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or 520-837-4951.
05/24/2022 WBERGER1 NPPO REVIEW Passed
06/16/2022 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T22CM03915
PLAN REVIEW COMMENTS
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, please provide an updated complete plan set with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment revisions.

SCOPE OF REVIEW:
The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.
GENERAL REQUIREMENTS:
The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans.
Sample plans are available at https://www.tucsonaz.gov/pdsd/residential-permits
SITE PLAN:
1. Indicate the location of buildings and any utilities supporting or effecting the proposed structure.

FOUNDATION PLAN:
1. Dimension the footing length, width, and depth into undisturbed soil for each footing type and condition, R403.1. Show the minimum 12” reinforced footing depth below the undisturbed ground surface R403.1. Show rebar reinforcement with 3” clearance from earth, R403.1.3.5.3. Provide ½” anchor bolts with 7” embedment, R403.1.6.

FRAMING PLAN:
1. A special inspection request is required with the permit application for field welding, R109.2. Show manufactured assemblies without field welding or submit a privately acquired certified inspector request form for approval.

SECTIONS - DETAILS:
1. Show roof (uplift resistance) rafter fasteners (H2.5) with appropriate uplift capacity, R802.11 amended.
2. Show ledger fasteners with stucco removal between wall studs and ledger.
3. Show the rafters with bearing contact to a wall top plate structure with foundation, R502.6 & R802.6. Replace the rafter connection to fascia or provide a registered Arizona engineer design analysis with seal.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
520 837-4912
City of Tucson Residential Plan Review
06/28/2022 PCAMARE1 ENGINEERING REVIEW Passed