Permit Number: T22CM03808
Parcel: 13502134B

Address:
6960 E 22ND ST

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM03808
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/27/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM03808


GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
Sheet A102 – Provide new structural slab detail after trench work.
Sheet A201 – Provide structural detail of overhang canopy shown in 2/A201 west elevation.
Sheet M501 – Provide structural duct support and grille details. 1/M501 states “LOADS MUST BE HUNG WITHIN 3” OF PANEL POINTS REF STRUCTURAL.”


BUILDING REVIEW COMMENTS:
Denied
General comment – Provide cover sheet.
General comment – Provide demolition site plan, floor plan and roof plan to show complete work. Is there separate demolition permit? Then provide documents as reference.
Architectural and Interior sheets – provide “date signed ____” in registered architect stamp. Date is missing while provided by MEP designers.
Architect and Interior sheets – Title block indicate that this is “DESIGN DEVELOPMENT DOCUMENT” by Architect of Record while this is “100 CD – FOR CONSTRUCTION.”
Sheet G001 - Provide new roof plan.
Sheet G001 - Provide building sections.
Sheet G002 – Identify male and female restrooms per required plumbing fixture calculations. Which restroom is designated for male and female in “RR1” and “RR2.”?
Sheet G002 – Provide occupancy calculation based on identified A-2 classification per 2018 IBC Assembly A-2 and occupant load factor of Table 1004.5. For example, commercial kitchen uses occupant load factor of 200 gross not 300. Clarify the function of space such as “ENGINE” and “WORKROOM.” “OFFICE” occupant load calculation is missing.
Sheet G002 – “OFFICE” is passing through kitchen to exist per 1014.2 shown in means of egress notes B. What is the common path of travel distance from the office? 3 seats are identified in this space.
Sheet G002 – Locate portable fire extinguisher cabinets per 2018 IBC section 906. Also provide details. Is it recessed or surface mounted?
Sheet G100 – Note shows “plans show existing slab to remain,” yet Sheet E104 provides electrical under slab plan. Show underground work in demolition floor plan.
Sheet A001 – Identify bollards at transformer. Keynote to identify.
Sheet A001 – Dimension the width of drive through lane.
Sheet A001 – Show drainage in new drive through lane: Direction to drain? New asphalt pavement?
Sheet A101 – Provide demolition floor plan to clarify scope of work. Was there demolition permit prior? Floor plan doesn’t match previous rectangular layout.
Sheet A102 – Provide legend symbol of trenching outline to clarify general notes G.
Sheet A201 – Provide accurate “KEYED NOTES.” Tagged keynotes does not match the list. For example, keynote 4 missing from the list.
Sheet A201 – Provide exterior wall materials per 2018 IBC chapter 14.
Sheet A202 – Provide exterior equipment access ladder per 2018 IMC 306.5.
Roof plan – Provide new roof plan and roof details. Provide details such as secondary (emergency overflow) drain or scupper per 2018 IBC 1502.2. Provide roof penetration details. New flashing/counter flashing, parapet, cricket, etc.? Provide demolition roof plan to clarify scope of work.
Sheet I103 – Office and kitchen ceiling height shown as “7’-4” AFF” while 7’-6” minimum is required per 2018 IBC section 1003.2.
Sheet I103 – Provide dimensions of mechanical registers per Sheet M101 general notes B. states “SEE ARCHITECTURAL SHEETS FOR DIMENSIONED DIFFUSER & EXPOSED DUCT LOCATIONS.”
Roof plan – Show rubber walk pad in new roof plan. Sheet M501 detail 10 states “RUBBER WALKPAD ADHERED TO ROOF REF ARCH.”


MECHANICAL REVIEW COMMENTS:
Denied
Sheet A101 – Provide insulation R value for exterior walls and roof per building envelope requirements of 2018 IEEC section C402.


ELECTRICAL REVIEW COMMENTS
Denied
Sheet E004 – Provide lumen calculation on plans per 2012 City of Tucson/Pima County Outdoor Lighting Code section 104.2.1.
Sheet E004 – The plan submission shall contain a note indicating weather special inspection is required in accordance with section 106 of 2012 City of Tucson/Pima County Outdoor Lighting Code.
Sheet E104 – Provide the color code of underground conductors provided in City of Tucson Amendments to the 2017 National Electrical Code section 210.5 to conform branch circuits color code.


PLUMBING REVIEW COMMENTS:
Denied
Sheet P102 – Provide grease interceptors per City of Tucson Amendments to the 2018 International Plumbing Code section 1003.3. The minimum sized gravity grease interceptors installed shall be 300 gallons. Retention time is at 30 minutes and storage factor at 25% per 1003.3. Provide Drainage Fixture Units per table defined in Pima County Industrial Wastewater Ordinance 13.36.420.


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
06/13/2022 ROBERT SHERRY WATER REVIEW Completed
06/15/2022 IMONSHI1 ENGINEERING REVIEW Passed
06/15/2022 IMONSHI1 ZONING REVIEW Approved
06/15/2022 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
07/06/2022 JVINCEN1 FIRE REVIEW Reqs Change See building comments.

john.vincent@tucsonaz.gov
5203495581

Final Status

Task End Date Reviewer's Name Type of Review Description
07/06/2022 VVERA1 OUT TO CUSTOMER Completed