Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM03761
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/19/2022 | WBERGER1 | ZONING | REVIEW | Approved | |
05/19/2022 | WBERGER1 | ENGINEERING | REVIEW | Passed | |
05/19/2022 | WBERGER1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
05/31/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/01/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
06/07/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
06/07/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
06/07/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
06/14/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Provide complete compliance with the 2018 IECC for the lighting. 2. Ref: plan sheet E-100. Coded Notes #2, #4, #8, #9. These notes are placing the responsibility on the contractor to ensure added load to various existing branch circuits does not result in circuit overload. The branch circuit loads are already calculated in the panel schedules. How did the branch circuit loads get accurately calculated if the potential exists to overload the circuits by adding loads as directed to existing branch circuits? It is the responsibility of the Design Professional not the contractor to ensure this does not occur by assigning branch circuit designations to OCPD’s through electrical design. Please address this. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |