Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T22CM03757
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/23/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
06/30/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. The Panel schedules do not correlate with the branch circuits shown on the electrical and lighting plans. The panel directory must accurately specify the loads served. Also the lighting with the encircled R, does that mean Remove or Relocate, or Recessed? In all cases specify the power source for the lighting and devices. NEC 408.4 The current adopted IECC is 2018 not 2012. Please revise the lighting calculation. If there is no load increase, please specify this on the power and lighting plans. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |