Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM03665
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/07/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM03663/BLDG #1, T22CM03664/BLDG #2, T22CM03665/BLDG #3 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E101 ELECTRICAL SITE PLAN: Poor alignment of Keyed Notes. E110 ELECTRICAL - ENLARGED UNIT PLANS: Missing Keynote #7. PLUMBING REVIEW COMMENTS: Denied Second Review: 1). OK 2). OK 3). OK 4). Now that the secondary overflow scupper info has been added to plan page A104 & on A501 Detail #3 , the overflow can't share the same inlet as the primary scupper, must have separate inlets. if the primary scupper inlet became blocked the storm water could not reach the secondary overflow with this current design. -IPC 1108.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 07/19/2022 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning comments |
| 07/19/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review Section PROJECT: T22CM03663, T22CM03664, & T22CM03665 4131 N Western Winds Dr Building interior remodel (2nd Review) TRANSMITTAL DATE: July 19, 2022 This comment was not addressed. COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Zoning has reviewed the building plans for compliance with DP22-0144. Although it appears that the building plans match the DP, Zoning cannot approve the building plan until the DP is approved. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
| 07/19/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/15/2022 | JPEELDA1 | FIRE | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/15/2022 | VVERA1 | OUT TO CUSTOMER | Completed |