Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM03591
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/11/2022 | WBERGER1 | ZONING | REVIEW | Approved | |
| 05/11/2022 | WBERGER1 | ENGINEERING | REVIEW | Passed | |
| 05/11/2022 | WBERGER1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 05/23/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/25/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 05/25/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 05/26/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The vent and the discharge pipe are separate entities and may not be combined. Reference: Section 303.2, IPC 2018. 2. Revise detail 5/A6 (waste and vent riser diagram) to provide a full-open valve on the discharge side of the check valve. Note that the manufacturer's installation instructions also call for a union on the discharge pipe. Reference: Sections 303.2 and 712.2, IPC 2018. 3. Verify that there is access for the check and full-open valves outside of the sump. Reference: Section 712.2, IPC 2018. 4. Connect the effluent of the sump pump to the sanitary drain system as described in Section 712.3.5, IPC 2018. 5. Verify that the connection point for the 1.5" forced waste pipe to the building drainage system is at least 10 pipe diameters from the base of any soil or waste stack or any fixture drain. Reference: Section 712.3.5, IPC 2018 |
| 06/06/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 06/24/2022 | JVINCEN1 | FIRE | REVIEW | Approved |