Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T22CM03478
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/02/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM03478 26410 N Estrella Ave – R-2 Fire Damage Repair (1st Review) – T21DV03224 TRANSMITTAL DATE: May 9, 2022 This site is located in the R-2 zone (UDC 4.7.9). Multi-family is a permitted use in this zone (Table 4.8-2), subject to Use Specific Standards 4.9.7.B.6, .9, & .10. 1. Based on aerial photos there area some type of attached structures along the south side of the building that are not shown on these plans. Provide approved permit documents for these structures or include them in this permit. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
06/02/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Provide a detailed description or scope of the electrical work required to restore the unit to code compliance. Include any branch circuit and load center modifications and verify compliance with requirements per NEC. 2. This project is categorized as commercial. Remove references to the IRC and refer code articles to the currently adopted 2017 NEC. 3. The load center must have working and dedicated clearances as required in art 110.26 and located per art's 240.24, and 408 NEC. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. 2012 Tucson/Pima County Outdoor Lighting Code (OLC). |
06/02/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
06/02/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Sections N1103.7 and N1109.1.2, IRC 2018. 2. Provide mechanical ventilation for the dwelling units. Reference: Section N1103.6 and N1109.1.2, IRC 2018. |
06/02/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show the location of the natural gas meters on the site plan. Verify the developed pipe length for the gas piping serving the two apartments. Reference: Section R106.1.1, IRC 2018. 2. Show how the size of the gas piping was determined. Reference: Section G2413.3, IRC 2018. |
06/04/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
06/10/2022 | IMONSHI1 | NPPO | REVIEW | Approved |