Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM03419
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/21/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: All sheets in this submittal must be sealed, signed, and dated by a registered design professional per the IBC Section 107. Please provide. 2. General: Please provide structural calculations that verify the existing roof is capable of supporting the new loads from the PV system. These calculations must be sealed, signed, and dated by a registered design professional. 3. General: Please provide written responses to all review comments. |
| 06/27/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered Electrical design professional. Provide complete electrical plans sealed by an Arizona Registrant. Ref; 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements |
| 06/30/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
| 06/30/2022 | IMONSHI1 | ZONING | REVIEW | Approved | |
| 07/18/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Plans show that they have a 36" fire setback. IFC 2018, Chapter 12, Section 1204.3.1-1204.3.2 shall be met. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 Fire Plans Examiner |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/18/2022 | VVERA1 | OUT TO CUSTOMER | Completed |