Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM03333
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM03333 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. The building addition area shall not exceed the limits specified in the provisions of Chapter 5 of the International Building Code. 2018 IEBC - 1102.2. Revise code sheet with the permitted actual building type of construction. 2. Where an addition is made to a building of a Group I-2, the existing building shall be equipped with carbon monoxide alarms in accordance with Section 1103.9 of the International Fire Code. 2018 IEBC - 1105.1. Revise plans with location of carbon monoxide alarms. 3. The building area shall not exceed the limits specified. 2018 IBC - Tables 504.4 and 506.2. A Institutional Group I-2, psychiatric hospital is not permitted to be built with V-B type of construction. 4. Missing method in determining fire-resistance rating for V-A type of construction for bearing walls and roof construction. 2018 IBC – Table 601, 703.2 or 703.3. Revise plans with listing, label and testing for one-hour fireresistance rating of walls and roof/ceiling construction (set forth in ASTM E 119 or UL 263 or prescriptive in section 721 or calculations in section 722). 5. Maximum design occupant load in room or space. 2018 IBC - Table 1004.5. Revise plans with maximum design occupant load for new room or space. MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Denied 1. 2017 NEC 210.8(B)(5). Provide GFCI protection for the receptacle outlets within 6’ of all sinks. Ckt CR-2 is within 6' of the edge of the sink and indicates that the 2nd receptacle out with GFCI protection is downstream of an unprotected receptacle outlet. PLUMBING REVIEW COMMENTS: Denied 1. 2018 IPC 918.4 - Air admittance valve shall be min. 4" above individual fixture drain. Detail 202/P2 shows min. 3". Revise plans to indicate min. 4" above individual fixture drain. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
05/18/2022 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM03333 La Frontera Mental Health Hospital (1st Review) 1601 E APACHE PARK PL Zoning C-2 TRANSMITTAL DATE: May 18, ?2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. As there are proposed changes to the site a Development Package meeting the requirements of the checklist for Minor Changes to Commercial/Industrial Site shall be submitted and approved prior to the approval of this building permit. The checklist can be found at: https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf. The DP is a separate submittal from this building permit and is submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using the Submission Type “Site Review”. This DP shall clearly show where the Proposed shade structure and wall will be placed on site. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
05/23/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
05/31/2022 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning comments |
05/31/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
06/01/2022 | JPEELDA1 | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/02/2022 | VVERA1 | OUT TO CUSTOMER | Completed |