Permit Number: T22CM03150
Parcel: 11450004K

Review Status: Completed

Review Details: OTHER

Permit Number - T22CM03150
Review Name: OTHER
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/19/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Provide plans that clearly show what you intend to do and do not have previous approval stamps from 12 years ago. Reference: Section 107.2.1, IBC 2018.
2. Provide cleanouts for the building sewer that are not located more than 100-feet apart, measured along the developed pipe length from the upstream entrance of the cleanout (i.e. the distance from the cleanout rim to the sewer invert plus the horizontal pipe length shall be less than 100-feet). Reference: Section 708.1.1, IPC 2018.
3. The rim elevation of the next upstream sanitary manhole (8716-08, 2506.34') is less than 12" below the first floor elevation (2507.2'). Provide a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/19/2022 VVERA1 OUT TO CUSTOMER Completed