Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/29/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
05/05/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM02962 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. The Geotechnical Report submitted is dated March 09, 2004 and references International Building Code 2000. Submit revised report based on IBC 2018 since Arizona have adopted the International Building Code 2018. 2. The Structural Calculations submitted for Jamb Stud Design DJM1 shows excessive deflections on page 90. Revise the size and resubmit calculations. 3. The Structural Calculations submitted for Jamb Stud Design DJM2 shows excessive deflections on page 96. Revise the size and resubmit calculations. 4. The Structural Calculations submitted for Jamb Stud Design DJM3 shows excessive deflections on page 102. Revise the size and resubmit calculations. 5. The Structural Calculations submitted for Jamb Stud Design DJM4 shows excessive deflections on page 108. Revise the size and resubmit calculations. 6. The Structural Calculations submitted for Jamb Stud Design DJM5 shows excessive deflections on page 114. Revise the size and resubmit calculations. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Approved 1. Approved for core and shell. Will have to provide plans for tenant buildout ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: Shell only 1). Plan set needs to be accompanied by site utility piping plan for continuation of sewer, fire main. -IPC 106.3.1 2). Roof Plan A2.1 primary scuppers need secondary drains illustrated along with sizing calculations for both/. -IPC 1108 3). If scuppers on plan page A2.1 have downspouts they will need to be illustrated along with sizing calculations. -IPC 1106.3 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
05/06/2022 | SAMUEL ROGERS | ZONING | REVIEW | Approved | FROM: Samuel Rogers PDSD Zoning Review Section PROJECT: T22CM02962 (Project Number) Shell Building (Project Type) (1st Review) 7375 S HOUGHTON RD (Address) TRANSMITTAL DATE: 04/26/2022 DUE DATE: 05/17/2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Any new structures on a commercial lot are required to be shown on a Development Package (DP) prior to the issuance of any building permits. Once the DP is issued Zoning will be able to review the building plan against it. If you have any questions about this transmittal, Contact Samuel Rogers at Samuel.Rogers@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Building Plans |
05/11/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
07/22/2022 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
08/01/2022 | EHAMBLI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/02/2022 | VVERA1 | OUT TO CUSTOMER | Completed |