Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM02941
Parcel: 121071110

Address:
5949 E LEE ST

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T22CM02941
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/21/2022 PAUL CAMARENA ZONING REVIEW Reqs Change FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: T22CM02941
Addition
5949 E LEE ST Zoning R-1

TRANSMITTAL DATE:? April ?21,2022


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1.COMMENT: The Pima County Assessor’s effective construction date for your building or structure is 1949. The actual construction date may be earlier.
Buildings, portions of buildings or structures that are 50 years of age or older must be architecturally documented prior to demolition. Documentation will be reviewed and approved by the Historic Preservation Office before a permit is issued.
Demolition (Historic and Older Structures) Application and General Information may be downloaded (PDF) at https://www.tucsonaz.gov/pdsd/all-application-forms-submittal-requirements
Return completed documentation to PDSDHistoric@tucsonaz.gov. Applicant will be contacted within 5 working days if additional materials are required for review.


If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
04/21/2022 PCAMARE1 ENGINEERING REVIEW Passed
04/21/2022 PCAMARE1 NPPO REVIEW Passed
05/20/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM02941

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Approved


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Denied
1. 2018 IRC Section M1201.1 and M1301.1. Provide mechanical drawings for review before installation.


ELECTRICAL REVIEW COMMENTS
Approved


PLUMBING REVIEW COMMENTS:
Denied
1. 2018 IRC Section M2005.1, Chapter 24 and 28. Revise drawings with fuel-burning water heaters venting details to exterior.
2. 2018 IRC Section G2413. Revise plans with main gas piping size, pressure provide at meter and pipe sizing method.


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov