Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T22CM02887
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/20/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Replacement of an AC unit constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacity of the unit being installed (Sections C403.3.1 and C403.2.2, IECC 2018). The unit will also have to comply with Sections C403.3.2, C403.4 and C403.5, IECC 2018 for efficiency, controls, and economizer. While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/20/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |