Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM02239
Parcel: 140221130

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T22CM02239
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/29/2022 VFLORES1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Reqs Change PLEASE CONTACT PC ADDRESSING BUILDING NUMBER NEEDS TO BE ASSIGNED PRIOR TO ISSUANCE Ph# 520-724-9512, EMAIL:ADDRESSING@PIMA.GOV
04/05/2022 JPEELDA1 FIRE REVIEW Reqs Change All buildings shall have one full side with aerial fire department access IFC 2018, Appendix D, D105.3. Please provide diagram of access and a note that it is aerial access and that canopy/solar shades shall never be installed.
Plans shall show the following as deferred submittals:
Fire sprinkler underground plans shall be submitted to and a permit obtained from TFD
Fire sprinkler underground plans shall be submitted to and a permit obtained from TFD
Fire alarm underground plans shall be submitted to and a permit obtained from TFD
Owner shall provide KNOX Boxes
Show the location of the fire riser rooms and F.D.C. Location


Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@tucsonaz.gov
520-837-7033
Fire Plans Examiner
04/06/2022 PAUL CAMARENA ZONING REVIEW Reqs Change REVIEW TRANSMITTAL

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: T22CM02227, T22CM02228, T22CM02229, T22CM02230, T22CM02231, T22CM02232, T22CM02233, T22CM02234, T22CM02235, T22CM02236 T22CM02237,T22CM02238, T22CM02239
Multi-Family (1st Review)
1701 E VALENCIA RD Zoning C-2

TRANSMITTAL: April 6, 2022

1. Zoning has reviewed the building plans for compliance with the associated unapproved Development Package DP22-0029. Zoning cannot approve the building plans until the DP is approved.

2.COMMENT: Clarify why there is a difference in building heights and square footage in the Development plan (Height35'5") and the Building Plan (Height 40',8")


If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
04/06/2022 PCAMARE1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
04/14/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM02239, T22CM02227, T22CM02228, T22CM02229, T22CM02230, T22CM02231, T22CM02232, T22CM02233, T22CM02234, T22CM02235, T22CM02236, T22CM02237, T22CM02238

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide accurate information regarding Current Codes per International Building Code 2018. The information provided on Structural Calculations is incorrect regarding ASCE7 on Sheet 1. The Calculations call for ASCE7-10, The IBC2018 calls for ASCE7-16. Revise calculations and resubmit.
2. The Foundation sizes shown on Sheet S1.0, S1.1 and S1.2 does not match with Foundation sizes on Structural Calculation sheets 21 thru 27. Revise drawings to match with sizes designed per Structural Calculation.
3. The Shear Walls shown on Structural Calculations does not match with Shear Walls shown on Drawings. Revise Drawings S2.0, S2.1, S3.0, S3.1 and S3.2 to match Structural Calculations pages 28 thru 38.
4. Balcony guards are to be designed for the loads provided in IBC 2018 Section 1607.8.1.
5. DEFERRED SUBMITTAL REQUIREMENTS
Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. Examples of items that likely should not be deferred include deep foundation elements, deep excavation shoring and prefabricated metal buildings.
If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Denied
1. Sheet T1.0: The applicable list only contains one building codes. Provide the comprehensive list of applicable and adopted building codes for this project.
2. Sheet A1.0: The reference for the fire protection system is incorrect. Provide a corrected code reference.
3. Sheet A1.0: This sheet references a "residential sprinkle system." Provide clarification as to what system is being used. There are different types of residential sprinkler systems (13R, 13D). Provide a corrected code reference for this sprinkler system.
4. Sheet A1.0: The allowable tabular floor area provided is incorrect for both building types. The allowable area for sprinklered multiple floors was used and this is incorrect. Table 506.2 sub notes indicates that this only used when a NFPA 13 system is used, however, it was previously indicated that a residential system would be used. Only a NFPA 13R system would be appropriate as a NFPA 13D would not applicable to this type of occupancy. Therefore, provide updated allowable area calculations or use a NFPA 13 system to use the current calculations.
5. Sheet A1.0: Provide the complete calculations for the desired frontage increase for both building types. Provide the calculation used to determine "W." Indicate these distances and measurements on a detailed drawing.
6. Sheet A1.0: Provide the type of sprinkler system being used for the business office.
7. Sheet A1.0: The allowable tabular floor area provided is incorrect. Provide a corrected allowable tabular area in accordance with Table 506.2.
8. Provide thorough egress plans for all building types.
9. Sheet A1.0: The occupant load provided for the business office is incorrect. The lounge area would be considered an assembly area and would need to be included into the occupant load calculations. Provide corrected occupant load calculations.
10. Sheet A2.12: Provide a detailed wall schedule that clearly shows the wall types and the construction of each wall type. These wall types should clearly show each material used, any required notes, needed dimensions, etc. The drawings provided are not clear. Additionally, all walls that are required to have a fire rated resistance should be accompanied by the UL listed drawing and it should the match the wall type provided.
11. Provide all UL listed penetration detail drawings.
12. Horizontal assemblies serving dwelling units separations are required shall be not less than 1-hour fire-resistancerated construction. Provide a detailed floor assembly drawing along with the UL listed rated assembly detail.
13. Draftstopping is required in combustible construction in accordance with Section 708.4.2. Provide draftstopping in accordance with Section 708.4.2.
14. Sheet A7.0: Handrails are required on both sides of the stairs. Provide handrails on both sides of the stairs in accordance with Section 1011.11.
15. Provide a handrail detail that meets ALL OF the applicable requirements of Section 1014. The hand rails provided are unclear and very little detail is provided.
16. Provide a guardrail detail the meets ALL OF the applicable requirements of Section 1015. The guardrail provided is not the correct in accordance with Section 1015.3. The guardrails provided are unclear and very little detail is provided.
17. Provide interior finish class schedule that meets all the applicable requirements of Chapter 8.


MECHANICAL REVIEW COMMENTS:
Denied
1. Kitchen exhaust to all apartment units shall exhaust to the outdoors sheet M4.6 (IMC2018,505.1)


ELECTRICAL REVIEW COMMENTS
Denied
E3.1 Electrical Unit 'B' and 'C': No electrical issues. Should consider upsizing panels B & C to 24 space panels.
Cover sheet Drawing List is missing the following sheets:
E1.1: Separated services shall meet NEC 230.2.E requirement ie the two services at each building need to have a placard or some means to identify that there is another service entrance to the building. Comment applies to E1.2 also.
E1.2: No electrical issues
E1.3: No electrical issues
E1.4: No electrical issues
E1.5: No electrical issues
E2.2: No electrical issues
E2.3: No electrical issues
E2.4: No electrical issues
E2.5: No electrical issues
E5.0: No electrical issues
E6.0: No electrical issues
E6.1: No electrical issues
E6.2: No electrical issues


PLUMBING REVIEW COMMENTS:
Denied
First Plumbing Review:
1). add gutter and Downspout illustrations with sizes & calculations to plan pages A6.0, 6.1, 6.2 or A3.0, 3.1, 3.2, 3.3, 3.4. - IPC 1106.3 & 1106.6
2). Pool equipment room on plan page P1.0 Or M1. needs combustion air. -IFGC 304
3). All of the Waste Stack Vent systems on plan pages P4.0 & P4.1 are undersized, the 2" waste stacks need to be 3" due to the DFU load of each being over 4 DFUs. & will need to remain 3" in size to the vent termination. Also update plan pages P1.1, 1.2, 1.3, 2.1, 2.2, 2.3 -IPC 913.3. & 913.4
4). Detail #4 on plan page P4 states the water heater relief valve is to be piped to the exterior, how will the relief valve manufacturer required 4 fitting maximum use & 30ft maximum distance be maintained? (Suggest pipe to water heater pan) - IPC 303.2 , 504.6 #5
5). The total DFU load for all buildings is 3336 DFUs, the 8" sewer main on Utility plan pages 1.0 & 2.0 is undersized the sewer needs to be 10 or 12" depending on pitch. -IPC 710.1
6). Add Fixture spacing measurements to plan pages A2.7 & A2.8 -IPC 404.2 & 405.3.1
7), Add Shower base or shower pan material specs to plan page P5.0 -IPC 106.3.1 , 421.5


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
04/21/2022 ROBERT SHERRY WATER REVIEW Completed
05/19/2022 SBLOOD1 ENGINEERING REVIEW Reqs Change The DP needs to be approved before the building plans can be approved.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
05/19/2022 VVERA1 OUT TO CUSTOMER Completed