Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM02101
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/30/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A0.0 (Building Code Analysis and Project Scope); Sheet A1.3 (Exiting Plan): The Code Analysis indicates an actual building area of 558 SF with 4 occupants, the Project Scope indicates 3428 SF, and the Exiting Plan indicates 863 SF + 150 SF = 1013 SF with 7 occupants. Please coordinate. 2. Sheet A0.0; Index: There is no Sheet A2.5 in this drawing set, and the Sheet P1.0 is MP1.0. Please revise. 3. Sheet A1.2; Floor Plan: Please indicate the new shower on the plan, including the shower head, seat, grab bars, and controls. 4. Sheet A1.3; Exiting Plan: Please indicate the exit access travel distances on the plan. Indicate these distances meet the requirements of the IBC Table 1017.2. 5. Sheet A2.0; Interior Wall: Please indicate the gauge of the steel wall studs. 6. Sheet A2.0; Details: Complete all details or remove from this sheet. 7. Sheet A2.1: Please add details for the shower grab bars and seat per the ICC/ANSI A117.1 Section 608. 8. General: Please provide a site plan for this project. 9. General: Please provide written responses to all review comments. |
03/31/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show how ventilation will be provided to the two new offices. Reference: Sections 401.2 and 401.3, IMC 2018. 2. Provide specifications for the new exhaust fan in the restroom/shower room. Reference: Section 107.2.1, IBC 2018. 3. The mechanical plan states that the mechanical system is "to remain as is" but the suite has an evaporative cooler and a packaged AC unit on the roof that do not appear to be configured as shown on sheet MP1.0. What is being retained and how is ventilation being provided? Reference: Section 107.2.1, IBC 2018. 4. The finish schedule calls for the ceiling to be exposed structure. What type of roof insulation is existing or will be installed? Note: the energy code analysis on A0.0 incorrectly shows the roof and wall insulation requirements for a metal building. Reference: Section 107.2.1, IBC 2018. |
03/31/2022 | PAUL CAMARENA | ZONING | REVIEW | Approved | |
03/31/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
03/31/2022 | PCAMARE1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/03/2022 | JVINCEN1 | FIRE | REVIEW | Reqs Change | See building comments. john.vincent@tucsonaz.gov 5203495581 |
04/13/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1. Indicate new and what is existing electrical devices, luminaires, and mechanical equipment on the electrical plan. 2. Show the location of the existing breaker panel. 3. Provide a complete luminaire schedule. 4. Where is the Timeclock controlling the bathroom exhaust fan? 5. Provide compliance with the 2012 Tucson/Pima County Outdoor Lighting Code for the exterior lighting, if applicable. 6. The electrical panel schedule does not correctly show the water heater (ckts 1,3). 7. It appears the IECC calculations do not include all the luminaires. Ref; 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements, 2012 Tucson/Pima County Outdoor Lighting Code. |
04/13/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Differentiate between the cold water, the hot water, and the hot water return piping. Reference: Section 107.2.1, IBC 2018. 2. The electric water heater detail on A2.4 shows a hot water recirculation system. Show the size and route of the return piping for the recirculated hot water for water heater on the plans. Reference: Section 107.2.1, IBC 2018. 3. Coordinate the plumbing fixture schedule with the plumbing fixture tags. Reference: Section 107.2.1, IBC 2018. 4. Provide details and specifications for the proposed shower (e.g. shower valves, Section 412.3, IPC 2018). If the shower does not have a prefabricated receptor, provide details to show that the construction of the receptor complies with the requirements of Section 421.5, IPC 2018. 5. Clarify how WH-1 is supported: The detail on A2.4 bears no resemblance to the representation on MP1.0. Reference: Section 107.2.1, IBC 2018 6. Section 604.1, IPC 2018 allows water distribution systems to be designed using accepted engineering methods. Provide the source of the method used to determine the water demand and size the water distribution system. Identify the existing plumbing fixtures that remain or have been removed. Reference: Section 107.2.1, IBC 2018. 7. Show how the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018. 8. Show the drainage fittings installed to guide sewage in the direction of flow. Reference: Section 706.3, IPC 2018. 9. Provide cleanouts for all horizontal drains; the cleanouts shall be sized per Section 708.1.7, IPC 2018 and shall open to allow cleaning in the direction of flow. Reference: Sections 708.1.1 and 708.1.8, IPC 2018. |
04/28/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed |