Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM01853
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/29/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
03/29/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM01853 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. Provide a typical wall schedule along with all associated details. MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E500: FYI: Transformer conductors are shown as undersized and on (3) 1 pole 20 Amp circuit breakers in H1A panel schedule. Transformers are not even shown in H2A, and H3A. Should show / call out as existing as these are shown on E400 Single Line. Should replace erroneous information with “Existing”. should correct for IFC. PLUMBING REVIEW COMMENTS: Denied First Review: 1). Illustrate water piping to the 1st floor double bowls in OTA lab on plan page P100. -IPC A106.3.1 2). Double Bowl sink in 1st floor OTA lab on P100 needs a sanitary vent. -IPC 901.2.1 3). All new sinks on plan page P100 1st & 2nd floors need hot water. -IPC 607.1 4). Coffee maker connection on P100 1st floor coffee bar needs an ASSE 1022 or 1024 backflow preventer -IPC 608.17.1.2 5). Are the restroom fixtures being replaced? if yes add to Plumbing fixture schedule on plan page P200 -IPC A106..3.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
03/29/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
03/29/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/30/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
04/13/2022 | ROBERT SHERRY | WATER | REVIEW | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/14/2022 | VVERA1 | OUT TO CUSTOMER | Completed |