Review Date Reviewer's Name Type of Review Description Status Comments
03/29/2022 SSHIELD1 ENGINEERING REVIEW Passed
03/29/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM01853

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Approved


BUILDING REVIEW COMMENTS:
Denied
1. Provide a typical wall schedule along with all associated details.


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E500: FYI: Transformer conductors are shown as undersized and on (3) 1 pole 20 Amp circuit breakers in H1A panel schedule. Transformers are not even shown in H2A, and H3A. Should show / call out as existing as these are shown on E400 Single Line. Should replace erroneous information with “Existing”. should correct for IFC.


PLUMBING REVIEW COMMENTS:
Denied
First Review:
1). Illustrate water piping to the 1st floor double bowls in OTA lab on plan page P100. -IPC A106.3.1
2). Double Bowl sink in 1st floor OTA lab on P100 needs a sanitary vent. -IPC 901.2.1
3). All new sinks on plan page P100 1st & 2nd floors need hot water. -IPC 607.1
4). Coffee maker connection on P100 1st floor coffee bar needs an ASSE 1022 or 1024 backflow preventer -IPC 608.17.1.2
5). Are the restroom fixtures being replaced? if yes add to Plumbing fixture schedule on plan page P200 -IPC A106..3.1


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
03/29/2022 STEVE SHIELDS ZONING REVIEW Approved
03/29/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
03/30/2022 JPEELDA1 FIRE REVIEW Approved
04/13/2022 ROBERT SHERRY WATER REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
04/14/2022 VVERA1 OUT TO CUSTOMER Completed