Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T22CM01803
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/22/2022 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: T22CM01803 Carport (1st Review) 9225 E 29TH ST Zoning R-1 TRANSMITTAL DATE: ?March ?22, ?2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. COMMENTS: Provide a Residential Plot Plan that meets the requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf. This shall include: Please show all new and existing structures on site. a. Actual setback dimension. c. All Utility lines d. Property line distances I have provided a link with a plot plan https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Grid.pdf If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
03/23/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
03/23/2022 | IMONSHI1 | NPPO | REVIEW | Passed | |
04/05/2022 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | 1. The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans. 2. Consolidate pages of construction plans into a single .PDF file as prescribed at the PDSD web site. 3. Provide an accurate site plan showing the location of alterations. 4. Show the door from a garage to dwelling with a 20-minute fire rating (or 1-3/8" solid core) with self-closing and self-latching provision, R302.5.1. 5. Show any roof framing alterations and beam sizes. A pipe column supporting roof loads requires a reinforced foundation. 6. Show the minimum 12" footing depth below the undisturbed ground surface with 12" minimum width for wood framed walls with minimum of one #4 rebar in the proposed continuous footing, R403.1. 7. Show the minimum hardboard sheathing thickness of 7/16", Table R703.4e. 8. Garage Receptacle: a 20 AMP receptacle outlet is required at each vehicle bay not more than 5.5 feet above the floor, E3901.9. |