Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM01801
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/17/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify the size of the existing water service to the building. The plumbing floor plan shows 1-1/4" but the water isometric shows 2". Reference: Section 107.2.1, IBC 2018. 2. Verify that the distance from the hot water source to the hot water termination for the new public lavatories complies with the requirements of Section C404.5, IECC 2018. |
03/17/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
03/17/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Tucson Water limits 5/8" water meters to maximum demand of 20 GPM. Provide a letter from Tucson Water confirming that the use of a 5/8" water meter will be allowed for this project with a demand of 23 GPM). |
03/21/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
03/22/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
03/29/2022 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
03/29/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
03/29/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/07/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |