Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM01507
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/12/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 03/16/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 03/16/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM01507 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Structural Calculations showing the adequacy of the Roof Framing to support KEF-FC-1 weighing 1346# and MAU-FC-1 weighing 1886# per Section 1601.1 of International Building Code 2018. Follow the load path from JoistsJoist Girders-Columns and Foundations. 2. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 3. Provide Structural Details showing the reinforcing required for the Steel Joists/Joist Girders to transfer the loadings from off panel points to the panel points of the Steel Joists/Joist Girders. 4. Non-load bearing walls require a deflection track or details to allow for the relative lateral deflection of the structural members. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1. Make up air shall be approximately the same as exhaust air for the kitchen. your exhausting 9350 cfm and bringing in through the MAU 7324 cfm your lacking 2026 cfm"s (IMC2018,508.1) (if your bringing in the remaining cfm through the RTU's, then in the RTU's schedule you need to note that and that it will be interlocked to the kitchen and dishwasher hoods just like the make up air unit is) 2. all equipment shall be on mechanical schedule and that includes the coolers (IMC2018,106.3.1) ELECTRICAL REVIEW COMMENTS Conditionally Approved E500 ELECTRICAL ONE-LINE DIAGRAM: Fault currents misidentified. F2 is probably shown as F3, F4 isn’t calculated. Provided Calculations prove panels do have sufficient KAIC rating, this is an FYI to correct. PLUMBING REVIEW COMMENTS: Denied First Review: 1). Add Fixture center to side wall measurements to plan pages A300 & A301. -IPC 405.3.1 2). Ice Machine, roof equipment condensate, & water softener discharge can't discharge to the grease system. update plan pages P200, P300, P301. -IPC 1003.2 3). Add existing grease interceptor type, size, & calculations to plan page P101 to show it meet the demand of the new restaurant. -Tucson Amendment 1003.3 4). How will the exterior hub drain on plan pages P200 & P301 be protected from receiving storm water? -IPC 1101.3 5). Each gas water heater on plan page P300 needs its own gas shut off valve & sediment trap. -IFGC 408.4 , 409.5 6). Add the gas sizing table used to plan page P301. -IFGC 402.4 7). Add gas regulator manufacturer & model number to plan page P300. -IFGC 410 8). Add the dishwasher drain water connection Check valve type info to plan page P300 detail #3. -IPC 608.3 9). What is the source of the #31 non-potable water on plan page P201? 10). Floor drains on plan pages P200 & P301Need Trap primers. update all affected pages. -IPC 1002.4.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 03/22/2022 | LSHAMIS1 | ZONING | REVIEW | Approved | |
| 03/22/2022 | LSHAMIS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 04/28/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/28/2022 | VVERA1 | OUT TO CUSTOMER | Completed |