| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/05/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 03/08/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet 1 (Site Plan); Sheets 2 and 3 (Plans): Buildings on the same lot must follow the guidelines of the IBC Section 705.3. Per Exception 1, the buildings shall be regulated as separate buildings or considered as portions of one building if the aggregate area of all portions is within the limits specified in Table 506.2. 2. Sheet 1 (Site Plan); Sheets 2 and 3 (Plans): If the buildings are to be considered as separate buildings, using the Fire Resistance Rating Requirements of the IBC Table 602, the adjacent exterior walls must meet the listed Fire Resistance Ratings for the listed fire separation distances. 3. Sheet 1 (Site Plan); Sheets 2 and 3 (Plans): Please provide an area analysis on the drawings indicating the method to be used per Comments 1 and 2. 4. General: Please provide a Special Inspections Certificate with Parts A and B completed as required. 5. Sheet 1: Please provide on this sheet the material strengths for concrete, reinforcing steel, structural framing, steel bolts and steel deck. In addition, list all loading criteria for wind, earthquake, and allowable soil bearing. 6. General: Please provide written responses to all review comments. |
| 03/15/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 03/15/2022 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning comments |
| 03/15/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM01243 818 S 6th Ave – C-3 New Shade Structure (1st Review) TRANSMITTAL: March 15, 2022 This site is located in the C-3 zone (UDC 4.7.22). 1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The DP is a separate submittal from the building plans and is submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using Submission Type “Site Review”. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/15/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |