Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM01215
Parcel: 128100530

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM01215
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/24/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Keynote 6 on sheet A2.0 and detail 2/A7.0 show the installation of a sink in the breakroom and then refer to the "plumbing drawings". Clarify the specifications for the sink and faucet and, if it is not being installed in the same location as the existing sink, show how the water supply, drain, and vent will be installed. Reference: Section 107.2.1, IBC 2018.
02/24/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
02/24/2022 ROBERT SHERRY WATER REVIEW Completed
03/02/2022 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
03/05/2022 JVINCEN1 FIRE REVIEW Approved
03/14/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Approved
03/15/2022 LSHAMIS1 ENGINEERING REVIEW Passed
03/15/2022 LSHAMIS1 ZONING REVIEW Approved
03/15/2022 LSHAMIS1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed