Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM01162
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/23/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the new HVAC unit. Reference: Section C403.1.1 and C403.3.1, IECC 2018. 2. Show that the proposed new HVAC equipment meets the minimum performance requirements of Section C403.3.2, IECC 2018. |
02/23/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide drinking fountains per Table 403.1 and Section 410.3, IPC 2018 (see also the Code Review Checklist on sheet A1.0). 2. Verify the size of the existing natural gas main. Based on Table 402.4 (2), IFGC 2018, a ¾" pipe can only accommodate 104 MBH at 100 feet of developed length. Reference: Section 402.3, IFGC 2018. |
02/23/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
03/05/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
03/10/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
03/14/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
03/14/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
03/14/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |