Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM00705
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/03/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/04/2022 | JGARCIA1 | ZONING | REVIEW | Passed | |
02/04/2022 | JGARCIA1 | ENGINEERING | REVIEW | Passed | |
02/04/2022 | JGARCIA1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
02/10/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
02/15/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Revise the mechanical design as required to avoid using the corridors as return air ducts. Reference: Section 601.2, IMC 2018. |
02/15/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide specifications and a water supply for the "water station" noted on sheet A101. The use of a point-of-use water dispenser in lieu of a drinking fountain requires the installation of a listed and labeled dispenser along with a permanently mounted disposable cup dispenser. The cup dispenser shall be located adjacent to the water dispenser with the dispensing end between 34" and 48" above the finished floor 2. Provide details showing how the proposed shower enclosure complies with the requirements of 421, IPC 2018. |
02/16/2022 | JVINCEN1 | FIRE | REVIEW | Reqs Change | Online the building shows that it is connected to 3940 without a parapet that might be a separation. If the buildings are not separate both shall have fire sprinklers installed. Show separation on drawings if one exists. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
02/28/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. Ref; Plan sheet E2.1 Please address the branch circuits circuiting for the lighting for the new or replaced luminaires. If they are all utilizing existing circuits with no increased loads, please address this with a note. 2. Some of the rooms do not show the switched branch circuits wiring from the switch(s) to the luminaires single and dual switched. Please show this in the lighting plan. Ref; Plan Sheet E1.1 and P2. The plumbing plans show an electric water heater being installed. Verify the power floor plan addresses this. If the water heater increases the load, please address this with a panel schedule showing load calculations. Please show the exhaust fan in the utility room. See mechanical plan M1. Ref; 2018 IBC sec 107.1, 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |