Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM00666
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/16/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/25/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
02/25/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM00666 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Structural Calculations for Foundations, Columns and Roof Framing per Section 1601.1 of International Building Code 2018. The Structural Calculations provided are inadequate and also, are not sealed and signed by a Professional Engineer as required by the IBC 2018, therefore are not acceptable. Check the deflections of the Beams and Girders of the Roof Framing. 2. Provide Wind Load Calculations for the Building per Section 1609 of International Building Code 2018. Show how the Braced Frames are resisting these lateral loads. 3. Provide Seismic Calculations for the Building per Section 1613 of International Building Code 2018. Show how the Braced Frames are resisting these lateral loads. 4. Verify if the Roof Deck is adequate as a diaphragm to transfer the lateral loads to the Lateral Loads Resisting Frames. 5. The Wind Speed shown on Drawing S001 does not match with the Wind Speed used in Structural Calculations. Verify and make changes as needed. 6. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 7. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 8. The Bearing Pressure used in Structural Calculations submitted does not match with the Bearing Pressure shown on Drawing S001. Investigate and make revisions as needed. 9. Verify if the canopy shown on Detail 4 Drawing A341 is adequately supported. 10. DEFERRED SUBMITTAL REQUIREMENTS Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1: * To be reviewed by design professional in responsible charge. * Design professional shall affix a notation that the deferred items are in general conformance with their design of the building. * They shall be submitted for review by the building official. * Shall not be installed until approved by building official. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Denied 1. The diagonal distance and exit distance is measured incorrectly. It must be the entire diagonal of the space. While the exits are properly separated, showing an accurate measurement is important. Provide a corrected exit separation distance in accordance with Section 1007.1.1. 2. Exit access for one of the access is through a receiving/storage area. Access through intervening spaces like this are not permitted in accordance with Section 1016.2 #5. 3. Sheet A004: Detail #5 is labelled incorrectly. 4. Sheet A111: The floor plan is labelled incorrectly. 5. No emergency exit lighting is shown on the reflected ceiling plan. Provide emergency exit lighting in accordance with Section 1013. 6. Provide a detailed site plan that includes property lines to ensure that exterior walls are compliant. MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Denied E001: Should provide grounding information for detail 2 Pole Base Detail. E101: RTU#1 needs to upsize conductor feed to #6 AWG as FLA is greater than 40 amps. E300: Should show Fire protection equipment ie smoke detectors, horn/strobes, and pull stations. E500: Should upsize CBs for RCU#s 1 & 2 to match Sheet RE1.1 detail B RCU MOPD requirements. UF1.1: Not included in set as per Drawing Index PLUMBING REVIEW COMMENTS: Denied 1). Plan Page A343 shows roof drain detail, Plan page A141 needs to show roof drain locations. Pages need to correlate. IPC A106.3.1 2). Plumbing pages need to illustrate above ground roof drain piping with sizing & GPM loads. -IPC 1106.2, A106.3.1 3). Plan page A343 shows overflow scupper with downspout detail, plan page A141 needs to show overflow locations. plan pages need to correlate. -IPC A106.3.1 4). Plan page A343 overflow scupper detail needs to include sizes & calculations. -IPC 1106.5, 1108.3 5). Plan page P111 shows an Overflow downspout detail connecting below grade, the secondary roof overflow drain needs to discharge above grade -IPC 1108.2. 6). Restroom #135 on plan page A153 toilet side wall to center measurement needs to comply with -IPC 405.3.1 7). Plan Page A153 needs to include lavatory side wall & center to center clearance measurements. -IPC 405.3.1 8). Trap primer detail #12 on plan page P301 needs to include a shut off valve. -IPC 606.2 |
03/03/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T22CM00666 451 W Auto Mall Dr – C-3 Storage Container Addition (1st Review) TRANSMITTAL: March 3, 2022 This site is located in the C-3 zone (UDC 4.7.22). Medical Service: Outpatient, limited to blood donor centers is a permitted use in this zone (Table 4.8-4) as a S = Permitted as Special Exception Use [1] Mayor and Council Special Exception Procedure, Section 3.4.4 1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The DP is a separate submittal from the building plans and is submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using Submission Type “Site Review”. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
03/03/2022 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning coomments |
03/03/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/03/2022 | VVERA1 | OUT TO CUSTOMER | Completed |