Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T22CM00578
Parcel: 132091450

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T22CM00578
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/02/2022 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: T22CM00578
2826 E Norton Vista – R-1
Refurbish and Addition (1st Review)

TRANSMITTAL DATE: February 2, 2022

This site is located in the R-1 zone (UDC 4.7.8). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.5 – 9.

1. The application states “Refurbish and Addition”, the plans are not clear on what is being refurbished and what is the addition. Cleary show what is new and what is existing.

2. Provide street perimeter yard setbacks on the plan.

3. Based on aerial photos there are several structures located in the rear yard that are not shown on the plan. Zoning was not able to find demo permits to remove these structures. If the structures are to remain shown them on the plan and include them in the lot coverage calculation. If they are to be demolished show them on the plan as such.

If you have any questions about this transmittal, please contact Elisa Hamblin at ElisaHamblin@tucsonaz.gov.
02/02/2022 SSHIELD1 ENGINEERING REVIEW Passed
02/04/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T22CM00578

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Approved


BUILDING REVIEW COMMENTS:
Denied
1. 2018 IRC Section R106.1.1. Revise site plan drawing with locations, sizes, and meters of building utility lines for gas, water, electric and sewer or septic from property line to building.
2. 2018 IRC Section R310. Revise drawings with emergency escape and rescue opening net clear dimension of window when fully open for every sleeping room (bedroom).
3. 2018 IRC Section 314.2, R314.3, R314.4 and R314.6. Revise electrical drawing with smoke detectors that are to be interconnected in such a manner that the actuation of one alarm will activate all of the alarms in the individual dwelling unit with primary power from the building wiring and battery backup.
4. 2018 IRC Section 315.2 and R315.3. Revise drawings with location of carbon monoxide alarm outside of the bedroom(s), when the dwelling unit includes a fuel-fired appliance and/or has an attached garage.


MECHANICAL REVIEW COMMENTS:
Denied
1. 2018 IRC Section M1201.1 and M1301.1. Provide mechanical drawings for review before installation.


ELECTRICAL REVIEW COMMENTS
Denied
1. 2018 IRC Section E3405 and E3606. Revise electrical drawings with location of main service and equipment panel including working space, clearances and access.
2. 2018 IRC Section E3603, E3607, E3608, E3609, E3610 and E3611. Revise electrical drawings with location of service grounding, bonding and conductor details.
3. 2018 IRC Added Section E3703.8. Revise electrical drawing with dishwasher and garbage disposer on the same 20-ampere branch circuit (15 amp shown).


PLUMBING REVIEW COMMENTS:
Denied
1. 2018 IRC Sections P2708.2, P2713.1, P2714.1, P2715.1 and P2716.1. Revise drawing 6 with minimum drain size of not less than 1 ½ inches in diameter for shower, bathtubs, sinks, laundry tubs and food-waste disposer.
2. 2018 IRC Section P2902.3. Revise drawings with backflow protection.
3. 2018 IRC Section P2903.9.1. Revise drawings with an accessible main full-open type shutoff valve near the entrance of the water service.
4. 2018 IRC Amended Section P3008.1. Where the finish floor elevation is less than 12 inches above the elevation of the next upstream manhole cover in the sewer, a backwater valve shall be installed in the building drain or branch of the building drain serving that floor. Floors discharging from above that reference point shall not discharge through the same back water valve.