Permit Number: T22CM00462
Parcel: 115072720

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T22CM00462
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/26/2022 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Revise the size of the gas main from the meter to the water heater branch from 1" to 1-1/4" (230 MBH @ 100-feet). Reference: Sections 402.1 and 402.3, IFGC 2018.
2. Provide third-party listing and material standards for all plumbing fixtures being provided by others. Reference: Sections 303.4 and 402, IPC 2018.
3. The fixture drain serving an automatic clothes washer shall connect to a fixture branch that is at least 3 inches in diameter. Reference: Section 406.2, IPC 2018.
01/26/2022 ROBERT SHERRY WATER REVIEW Completed
01/27/2022 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. AC-1 supplies several different zones, but the ventilation calculations are for a single-zone recirculating system. Revise the ventilation calculations per Section 403.3.1.1.2.3 (Multiple zone recirculating system).
2. Revise the mechanical design as required to avoid using the corridor as a return air duct. Reference: Section 601.2, IMC 2018.
02/01/2022 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
02/07/2022 SBLOOD1 ENGINEERING REVIEW Passed
02/14/2022 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

1 . Provide a complete line diagram indicating the conduit and conductor sizes and types connections to all associated equipment and or loadcenters (panels) downstream of the existing service.

2. Show branch circuit and panel identifications for the exhaust fans.

3. Are all the receptacles new? Please indicate.

4. Show the locations of all the panels in the lighting and power floorplans.

5. Include bonding of the water, gas piping and building steel if applicable per NEC 250.

6. Provide complete electrical load calculations for the building and panels.

7. What is the electrical service rating in amps.

Ref; 2018 IBC sec 107.1, 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements.
02/23/2022 LSHAMIS1 ZONING REVIEW Approved
02/23/2022 LSHAMIS1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
03/02/2022 JPEELDA1 FIRE REVIEW Approved