Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T22CM00402
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/27/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf |
02/04/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T22CM00401 & T22CM00402 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: N/A BUILDING REVIEW COMMENTS: Denied 1. The maximum allowable sq. ft. has been exceeded in accordance with Section 506. The maximum allowable area for an S-1 occupancy of Type IIB construction is 70,000 sq. ft. No area increase calculations have been provided to rationalize the increase of sq. ft. 2. Provide a complete set of existing and demolition plans. 3. Provide a statement of special inspections. MECHANICAL REVIEW COMMENTS: Denied 1. A level working platform shall be provided for appliances in an approved manner Sheet A2.2 (IMC2018,306.5.1) 2. Provide ducting and sizes to what these are connected to and show connections Sheet M2.1(IMC2018,106.3.1) 3. Identify the rtu numbers to all units Sheet M2.1 (IMC2018,106.3.1) 4 Appliances located on elevated structures above 16' shall have a permanent means of access in an approved manner sheet M2.2 (IMC2018,306.5) 5. Provide duct sizes on branch runs Sheet M4.1(IMC2018,106.3.1) 6. You are required to bring in 6,995 cfm of outdoor air you are only bringing in 3,212 through the rooftop units Please correct sheet M6.1(IMC2018.403.3.1.1.1) ELECTRICAL REVIEW COMMENTS Denied E5.1 Provide conductor sizes and short circuit calculations for each panel. Relocated panels require new calculations as distances and feeders affect these values and this is a Tuscon City requirement. PLUMBING REVIEW COMMENTS: Denied 1). Plan page A2.2 Roof plan needs to show each down spout location. -IPC A106.3.1 2). Plan page A2.2 roof plan needs to include gutter & downspout sizing calculations. that derive from -IPC 1106.1, 1106.3, 1106.6, & Tucson amendment appendix B 3). Plan page A2.2 has multiple gutters that don't correlate with any of the sizing key notes. please make more clear. -IPC A106.3.1 4). Plan pages A2.9 roof details, & Plumbing demo pages PD 2.1, PD3.1, &PD3.2 are missing? -IPC A106.3.1 5). Add gas piping operating pressure & sizing table used to the gas calculations notes on plan pg. P2.2. -IFGC 402.4 6). Add gas piping roof support detail to plan page P5.1 or P5.2. -IFGC A106.3.1, 404.9, 415.1 7). Add gas piping material information to plan MEP0.2 or P2.2 -IFGC 404.1 8). Water heater detail on plan pg. P5.1 needs to include seismic supports. -IPC 502.4 9). Site utility piping plan C6.0 Bldg. Fire, water, sewer and storm connections don't correlate with plan pg P2.1. -IPC A106.3.1 10). Key note #6 Storm drain, needs to illustrate the routing, sizing, and connection point information on P2.1 & C6.0. -IPC A106.3.1 |
02/07/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building plans can be approved. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
02/17/2022 | LSHAMIS1 | ZONING | REVIEW | Reqs Change | ZONING CANNOT APPROVE PLANS UNTIL DP21-0298 IS APPROVED |
03/02/2022 | JPEELDA1 | FIRE | REVIEW | Reqs Change | REVIEW COMMENTS: Denied 1. The maximum allowable sq. ft. has been exceeded in accordance with Section 506. The maximum allowable area for an S-1 occupancy of Type IIB construction is 70,000 sq. ft. No area increase calculations have been provided to rationalize the increase of sq. ft. 2. Provide a complete set of existing and demolition plans. 3. Provide information on "storage/commodities" if storing on shelves, racks and or pallets greater than 12' , Chapter 32 of the IFC shall be met. If storing less than 12' that shall be clearly defined on your drawings. Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
03/02/2022 | LSHAMIS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/02/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |