Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T22CM00329
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/25/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
01/25/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Show how the water-cooled developer, P-1, complies with the requirements of Section 930, IMC 2018, as amended by the City of Tucson. 2. Identify the nitrogen pipes in accordance with ASME A13.1. Reference: Section5003.2.2.1, IFC 2018. |
01/25/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Vacuum jacketed piping is typically used for transporting liquid nitrogen while uninsulated stainless steel piping is used for gaseous nitrogen. Expansion and contraction of the piping at the transition between the two nitrogen states can be extensive. Show how expansion and contraction of the piping runs will be accommodated. Reference: Section 305.2, IPC 2018. 2. If potable water is to be used for cooling of the developer, P-1, provide backflow protection for the potable water distribution system. Reference: Sections 608.1 and 608.3, IPC 2018. |
01/25/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
02/07/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. 1 . Provide a complete electrical line diagram and show all conductor, conduit, sizes and types for the secondary service feeders. 2. Provide compliance with NEC 250.58 for common grounding of multiple services. 3. Provide for a permanent plaque to be installed at each service location NEC 230.2E. Ref; 2018 IBC sec 107.1, 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |
02/08/2022 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
02/09/2022 | IMONSHI1 | ZONING | REVIEW | Approved | |
02/09/2022 | IMONSHI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
03/05/2022 | JPEELDA1 | FIRE | REVIEW | Approved | entered notes for a different plan set |