| 01/17/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/20/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 01/20/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the sanitary riser diagram to coordinate with the proposed sanitary floor plan for the number, type, and general location of the fixtures. 2. Faucets serving lavatories in all buildings other than R3 occupancies, individual units in R2 occupancies, or International Residential Code structures shall be automatic faucets dispensing a maximum of 0.25 gallons per cycle. The cycle time shall not be less than ten-seconds for accessibility. Reference: Section 419.6, IPC 2018 as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 4. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, 607.2, and 607.3, IPC 2018. 5. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018 (e.g. maximum distance of 24" for ½" pipe, 6" for ¾" pipe). 6. Section 604.1, IPC 2018 allows water distribution systems to be designed using accepted engineering methods. Provide the source of the method used to determine the water demand. It appears that the fixture unit values may be for private fixtures instead of public fixtures. 7. Provide cleanouts for all horizontal drains (e.g. the horizontal drain from the two lavatories in the women's restroom, the horizontal drain from the two urinals in the men's restroom, and the horizontal drain from the two sinks in the janitor's closet). Reference: Section 708.1.1, IPC 2018. 8. An approved 2-way cleanout fitting is allowed to be used at the junction of a building drain and a building sewer; otherwise, cleanouts shall open to allow cleaning in the direction of flow (i.e. one-way cleanouts). Reference: Section 708.1.8, IPC 2018. |
| 01/20/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Show the location of the existing water meter, backflow preventer, and the water service pipe on a site plan. Provide the size of the water meter serving this building and the size of the backflow preventer associated with the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018. |
| 01/26/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. Provide an electrical plan. 1. Provide a complete panel schedule and correlate branch circuits with the electrical appliances, lighting and devices, on the power and lighting floorplan. 2. Show the electric water heater and all switches and receptacles where applicable on the electrical plan. 3. Provide compliance with the 2018 IECC for the lighting and a complete luminaire schedule. 6. Provide a legend for all electrical symbols. Ref; 2018 IBC sec 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements. |
| 01/27/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 01/27/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 02/03/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp. Instructions: 1. Is this for a new or existing activity application? - Please select New Application. 2. Submission Type - Select Floodplain Use Permit. 3. Project Name - Enter a name for your project. 4. Type of Permit - Select Commercial or Residential (Residential is for work on single family residences and duplexes.) 5. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided. 6. Description of Work - Enter in Floodplain Use Permit for…and then put a description of the work being done or reference the building permit number associated with this floodplain use permit. 7. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account. 8. Complete the Contractor, Owner and Architect/Engineer sections as applicable. 9. Supporting Documentation Upload - Provide a complete cost estimate for the project unless it is for a new build/separate structure. You may also provide additional documents you think will be helpful. 10. Sign the application and submit. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 02/24/2022 | JVINCEN1 | FIRE | REVIEW | Approved |