Permit Review Detail
Review Status: Completed
Review Details: POOL - COMM MODEL
Permit Number - T22BU00266
Review Name: POOL - COMM MODEL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/25/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 07/25/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 07/27/2022 | PAUL CAMARENA | ZONING | REVIEW | Passed | |
| 08/02/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Provide plans sealed by an Arizona Registrant that show detailed information as to extent of the proposed electrical work. Reference: Sections 107.1 and 107.2.1, IBC 2018, 2017 NEC, 2018 IECC, 2012 TUCSON/PIMA COUNTY OUTDOOR LIGHTING CODE and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. |
| 08/17/2022 | PCAMARE1 | ENGINEERING | REVIEW | Approved | This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp. Instructions: • Is this for a new or existing activity application? – Please select New Application. • Submission Type – Select Floodplain Use Permit. • Project Name – Enter a name for your project. • Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided. • Type of Permit – Select Commercial or Residential (Residential is for work on single family residences and duplexes.) • Complete the Applicant Info. • Complete the Contractor, Owner and Architect/Engineer sections as applicable. • Supporting Documentation Upload – Provide a complete cost estimate for the project. You may also provide additional documents you think will be helpful. • Sign the application and submit. • You will be given an activity number for your submittal. Please copy and send this number back to us so we can continue the review. |
| 08/19/2022 | WILDAN | BUILDING-COMMERCIAL | REVIEW | Completed |