Permit Number: T21RW01322
Parcel: 999999999

Review Status: Completed

Review Details: ROW SWF - SUBMITTAL

Permit Number - T21RW01322
Review Name: ROW SWF - SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/24/2021 JSANDER1 START START Completed
03/24/2021 JSANDER1 HISTORIC Review Completed
03/30/2021 JSANDER1 IT_NETWK REVIEW Approved
03/31/2021 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change Reviewer:
Richard Leigh
Richard.leigh@tucsonaz.gov

Site plan:

1. Sheets C1, C1.1, E1, E2: Revise drawings to depict existing curb ramp.

2. Sheets C1, C1.1, E1, E2: Revise drawings to relocate proposed vaults out of the curb access ramp.

Temporary Traffic Control Plan

1. Revise TCP to address pedestrian considerations. ADA compliant pedestrian circulation shall be maintained through or around the worksite without directing pedestrians across the street.

2. Revise TCP to maintain driveway access to the businesses to the first two driveways north of Blacklidge Dr.

3. Revise TCP to indicate placement of double sided blue “Business Access” signs at all business driveways.

4. Revise TCP to indicate where the bus stop located at the NE corner of Campbell Ave and Blacklidge Dr will be relocated to. Coordinate bus stop relocation with Sun Tran.
03/31/2021 RLEIGH1 DOT_WATER REVIEW Approved Reviewer:
Richard Leigh
DTM Engineering
Richard.leigh@tucsonaz.gov


Site plan:
1. Sheets C1, C1.1, E1, E2: Revise drawings to depict existing curb ramp.
2. Sheets C1, C1.1, E1, E2: Revise drawings to relocate proposed vaults out of the curb access ramp.

Temporary Traffic Control Plan
1. Revise TCP to address pedestrian considerations. ADA compliant pedestrian circulation shall be maintained through or around the worksite without directing pedestrians across the street.
2. Revise TCP to maintain driveway access to the businesses to the first two driveways north of Blacklidge Dr.
3. Revise TCP to indicate placement of double sided blue "Business Access" signs at all business driveways.
4. Revise TCP to indicate where the bus stop located at the NE corner of Campbell Ave and Blacklidge Dr will be relocated to. Coordinate bus stop relocation with Sun Tran.
04/01/2021 JSANDER1 DOT STREET MAINTENANCE REVIEW Approved
04/02/2021 JSANDER1 DOT_ELEC REVIEW Approved