Permit Review Detail
Review Status: Completed
Review Details: ROW SWF - RE-SUBMITTAL
Permit Number - T21RW01056
Review Name: ROW SWF - RE-SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/31/2021 | JSANDER1 | START | START | Completed | |
03/31/2021 | JSANDER1 | DOT_ELEC | REVIEW | Approved | |
04/08/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | Fremont Avenue is under a pavement cut moratorium until May 29, 2024. Any pavement cuts within Fremont Ave will require the area around the disturbed pavement area to be milled 2" and overlayed with PAG 2 Mix (PG 76-22TR+) asphaltic concrete. Indicate on plans the mill and pave requirements and delineate the mill and pave area which shall be the east half of Fremont Ave from the north point of intersection with Drachman Street to 25 feet north of the of the northern most trench edge. |
04/08/2021 | JSANDER1 | REAL_ESTATE | REVIEW | Needs Review |