Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: ROW SWF - SUBMITTAL
Permit Number - T21RW01056
Review Name: ROW SWF - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/08/2021 | JSANDER1 | START | START | Completed | |
03/09/2021 | JSANDER1 | IT_NETWK | REVIEW | Approved | |
03/09/2021 | JSANDER1 | HISTORIC | Review | Completed | |
03/16/2021 | RLEIGH1 | DOT_WATER | REVIEW | Approved | |
03/16/2021 | JSANDER1 | DOT STREET MAINTENANCE | REVIEW | Approved | |
03/16/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | Reviewer: Richard Leigh Sr. Engineering Associate Department of Transportation and Mobility 520-837-6647 Office 520-237-8692 Cell Richard.Leigh@tucsonaz.gov Construction drawings for AZ_TUC_MOBY_12 (676969): 1. Revise drawing to accurately depict existing curb access ramp configuration at the NE corner of Drachman Street and Fremont Avenue 2. Revise drawing to place the proposed Verizon wireless junction box closer to the edge of sidewalk near the property line. 3. Fremont Avenue is under a pavement cut moratorium until May 29, 2024. Place a note in the DOTM Standard Notes indicating this and that any pavement cuts within Freemont Avenue will require the pavement on each side of the bore pit and half of the roadway width or the full Pavement width (depending on pavement cut location) be milled 2" and overlayed with PAG 2 Mix (PG 76-22TR+) asphaltic concrete. Temporay Traffic control Plan: Due to the heavy the pedestrian traffic in the area, it is recommended that pedestrian circulation on the west side of Fremont Avenue be maintained if pedestrians can be safely separated for the work zone. |
03/20/2021 | JSANDER1 | DOT_ELEC | REVIEW | Reqs Change | Move location of SWF to provide for the luminaire to be positioned over the roadway so that it is in the same position as the existing and at the same height. |
03/20/2021 | JSANDER1 | REAL_ESTATE | REVIEW | Needs Review |