Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: T21PRE0252
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T21PRE0252
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 200 - 230 pm - T21PRE0252 - 2151 N PALO VERDE BL - Site Veritas Academy. (Special Exception)

1. Tucson Water's New Area Development Unit has no objections to the proposed development.

2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
01/04/2022 PETER MCLAUGHLIN COT NON-DSD REVIEW Completed To proceed with the proposal, the Entitlements Section will need to recieve a letter requesting a change of Zoning Examiner condition #10, which limits the enrollment to 198 students. The letter should also request a change to the PDP for any new buildings/classrooms are proposed, as well as for any other conditions that might need to be reviesd as part of the new PDP.

The first step in the process would be to submit a presubmittal meeting form, with a Preliminary Development Plan to the specifications of the City of Tucson Administrative Manual 2-03.4.2.A and .B.
No presubmittal fee is currently required to scedule to presubmittal meeting.

To expedite scheduling of the presubmittal meeting you can email the plans and meeting application form directly to Susan Montes at: susan.montes@tucsonaz.gov

Here is a link to the presubmittal application:
https://www.tucsonaz.gov/files/pdsd/pdfs/Rezoning_Pre_Submittal_Application_and_Information_Letter.pdf

Peter McLaughlin
837-4898
01/05/2022 LOREN MAKUS ENGINEERING REVIEW Completed 1. Maximize water harvesting.
2. Show roof drainage and show that sidewalks are kept free from roof or surface drainage.
3. Show pedestrian connections to existing facilities and to streets.
Loren Makus
loren.makus@tucsonaz.gov
01/05/2022 AWARNER1 LANDSCAPE REVIEW Passed
01/06/2022 JVWINKL1 COT NON-DSD TRAFFIC Completed T21PRE0252

1) Site expansion calculations are not provided. Assuming that full site compliance is not required as part of this project. No Adverse Comments
01/06/2022 SAMUEL ROGERS ZONING REVIEW Completed
12/28/2021 MROSS2 COT NON-DSD FIRE Completed Modification to the fire alarm system will be required.


Michael Ross
Tucson Fire Department
Michael.Ross2@tucsonaz.gov
520-837-7082