Plan Number: T21PRE0226
Parcel: Unknown

Address:
340 E ELVIRA RD

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T21PRE0226
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/03/2021 IMONSHI1 ZONING REVIEW Reqs Change FROM: Iman Monshizadeh

PDSD Zoning Review Section



PROJECT: T21PRE0220 – 340 E Elvira Rd – R-2 – Elvira Rental Community

TRANSMITTAL DATE: 11/02/2021



1.COMMENT: A Development Package will be required for this site. Development package submittal requirements can be found at:

https://www.tucsonaz.gov/files/pdsd/forms/Submittal_Requirements.pdf

2.COMMENT: Commercial parking and access requirements will need to be met for the site. Parking will need to be fully dimensioned and shown to comply with section 7.4 Motor Vehicle and Bicycle Parking of the Unified Development Code

Although the parking calculations shown on plans seem to be correct, the required number of parking spaces will be dependent on the number of bedrooms per unit. All parking must be on site.

On site maneuverability will need to be detailed and shown on plans. Pedestrian access will need to be detailed on plans and designed in accordance to Section 7 of the Technical Standards Manual.

Required ADA parking will need to be provided in an accessible spot with wheelchair access available to the accessible structure.

3.COMMENT: Side and rear setbacks will be dependent on the height of each structure. Setback requirements for a non-residential use to a residential zone in an R-2 are 10’ or ¾ *Height (whichever is greater). Height is measured from design grade to top of wall of structure.

4.COMMENT: Parcel is within a AE height zone for Tucson Internation Airport with a max Height limit of 80-84'



For questions regarding Zoning comments, please contact me at: Iman.Monshizadeh@tucsonaz.gov

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp
11/03/2021 MROSS2 COT NON-DSD FIRE Completed D103.4 Dead ends.
Dead-end fire apparatus access roads in excess of 150 feed shall be provided with width and turnaround provisions in accordance with Table D103.4. (120-foot hammerhead, 60-foot "Y" or 96-foot cul-de-sac)

FIRE HYDRANTS

507.5.1 Where required.
Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.

Exceptions:
1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 ft.

2. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet.

903.2.8 Group R.

An automatic sprinkler system installed in accordance with Section 903.3 shall be provided throughout all buildings with a Group R fire area.

A fire alarm system will be required.


Michael Ross
Tucson Fire Department
520-837-7082
Michael.Ross2@tucsonaz.gov
11/03/2021 AWARNER1 LANDSCAPE REVIEW Completed CDRC TRANSMITTAL

PROJECT: Elvira Multi-family
ACTIVITY NO. T21PRE0226

7.6 Landscaping and Screening
The Unified Development Code (UDC) requires all new development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.
" Min. 10' street landscape border is required along Elvira
" Min. 10' interior landscape border is required adjacent to residential uses


7.7. Native Plant Preservation
An approved Native Plant Preservation Plan Sections 7.7.4 is required requirements in accordance with Sections 7.7.3.D.3 & .4 of the Unified Development Code (UDC) and Admin. Manual Section 2-11.0.0 is required prior to Grading Plan approval.

Commercial Rainwater Harvesting plan is required UDC Technical Standards Manual - Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening
Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design.
https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-manual-board-version-201511.pdf

If you have any questions about this transmittal, contact Anne Warner, RLA
PDSD Landscape/NPPO Review at email anne.warner@tucsonaz.gov
11/04/2021 JVWINKL1 COT NON-DSD TRAFFIC Completed T21PRE0226

1) Curbing per TSM section 10-01.3.2,along E Elvira Rd, to adequately control drainage and access will be required. In addition, provide a 5' wide sidewalk along E Elvira Rd. Alternative means of drainage and access control may be considered

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
11/04/2021 SBLOOD1 ENGINEERING REVIEW Completed 1. Site is in a balanced basin. Balanced basin detention and first flush retention are required.
2. Maximize water harvesting.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
11/04/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 200 - 230 pm - T21PRE0226 - 340 E ELVIRA RD - Site Elvira Rental Community

1. Tucson Water's New Area Development Unit has no objections to the proposed development and offers the following comments for your convenience.

2. The owner/developer will be responsible for constructing any on-site public water mains necessary to serve this property. Please contact Tucson Water's New Services section by sending an e-mail to TW_COMMON@tucsonaz.gov to discuss the advantages and disadvantages of installing any necessary on-site public water main, and the necessary water meters via Tucson Water's Job Order Contract (JOC) process.

3. The water pressure in this area is estimated to be in the 60-67 psi range.

4. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov