Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T21PRE0215
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T21PRE0215
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/13/2021 MROSS2 COT NON-DSD FIRE Completed None
10/18/2021 AWARNER1 LANDSCAPE REVIEW Passed
10/20/2021 IMONSHI1 ZONING REVIEW Completed FROM: Iman Monshizadeh

PDSD Zoning Review Section



PROJECT: T21PRE0215 – TARP systems – R-1 Zone – 1110 W Irvington

TRANSMITTAL DATE: 10/18/2021



1.COMMENT: Use Specific Standards 4.9.11.A.1, .2, .5, .8, .9, .11 apply to this project:

https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-2930

Below are some that may be worth noting for this project.

1. The setback of the facility, including walls or equipment, shall be 20 feet from any adjacent residential zone.

2. The setback of the facility, including walls or equipment, shall be 200 feet from any existing adjacent residential zone. This setback may be varied in accordance with Sections 3.10.1 and 3.10.3, Board of Adjustment Variance Procedure.

8. Any building housing such facility shall be in keeping with the character of the zone in which it is located. The Design Review Board (DRB) shall review all applications and make recommendations to the Zoning Examiner. The DRB shall review architectural style, building elevations, materials on exterior facades, color schemes, new mechanical equipment locations, lighting of outdoor areas, window locations and types, screening, landscaping , vehicular use areas , and other contributing design features.

9. The use shall be located wholly within an enclosed building or within an area enclosed on all sides with a masonry wall or compact evergreen hedge, not less than six feet, nor more than ten feet, in height



2.COMMENT: Provide expansion calculations for the new additions on the submittal.



3.COMMENT: A Special exception may be required for this site unless one can be provided for the existing development package. This project can be done through a revision to the development package DP19-0294.



For questions regarding Zoning comments, please contact me at: Iman.Monshizadeh@tucsonaz.gov

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp
10/20/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed Email from: Tim Rowe
To: CDRC
Tue 10/19/21

Site/Grading/Floodplain: TARP is a Tucson Water project. So, I will not be commenting on it.

Tim Rowe, P.E., Civil Engineer

Tucson Water, New Area Development Unit
210 N Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
10/21/2021 JVWINKL1 COT NON-DSD TRAFFIC Completed T21PRE0215

1) No adverse comments
10/21/2021 SBLOOD1 ENGINEERING REVIEW Completed 1. Due to the penetration of the bank protection and discharge into the Santa Cruz River a Facility Impact Permit will be required from the Regional Flood Control District and you need to be in coordination with them from the early stages of development.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov