Plan Number: T21PRE0168
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T21PRE0168
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/13/2021 AWARNER1 LANDSCAPE REVIEW Passed
08/17/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 210 - 230 pm - T21PRE0168 - 225 E PENNINGTON ST - Site Public restrooms, Rio Nuevo downtown

1. Tucson Water's New Area Development Unit has no objections to the proposed development.

2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
08/18/2021 MROSS2 COT NON-DSD FIRE Completed None
08/19/2021 NICHOLAS ROSS ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Nick Ross; Principal Planner

PROJECT: Thursday Pre-submittal meeting - T21PRE0168
Address: 225 E. Pennington St
Parcel(s): 11706083A
Zoning: OCR-2
Existing Use: Parking
Proposed Use: Parking

TRANSMITTAL DATE:

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Parking is a permitted use in the OCR-2 zone.
3. No dimensions were given on this proposal so it cannot be confirmed if setbacks or PAAL widths meet standards.
4. ADA compliant path from all buildings on site to the ROW is required.
5. The proposal is an expansion of 25% or greater and will require full code compliance. Some of these standards, such as landscape and setbacks can be waived entirely with successful IID approval.
6. Work in the ROW will require a separate permit from DTM.
7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at nicholas.ross@tucsonaz.gov.
08/19/2021 JVWINKL1 COT NON-DSD TRAFFIC Completed T21PRE0168

1) Un-used drivway will need to be closed off since the vehicular use area is going away
08/19/2021 SBLOOD1 ENGINEERING REVIEW Completed No Comments

Stephen Blood
(520) 837-4958