Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Active
Review Details: PREAPPLICATION MEETING
Plan Number - T21PRE0121
Review Name: PREAPPLICATION MEETING
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/01/2021 | JOHN BEALL | M&C Public Hearing 4 Plan Amendment | Set M&C Public Hearing Date | Active | |
06/01/2021 | MROSS2 | FIRE | REVIEW | Completed | Fire Hydrants 507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: For Group R-3 and Group U occupancies, the distance requirement shall be 600 ft. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet. Michael Ross 520-837-7082 Michael.Ross2@tucsonaz.gov |
06/01/2021 | BILLIE LEE | COMMENTS | COMMENTS | Active | |
06/02/2021 | ELISA HAMBLIN | ZONING | REVIEW | Completed | T21PRE0121 - 1980 E Ajo Wy 1. The proposed use, building heights, parking and setbacks appear adequate. 2. Please address pedestrian circulation from Ajo Wy to both buildings on site in phase one and two. Internal ped circulation standards must also be met per Technical Standards Manual Section 7. 3. Recommend a 2-pg Preliminary Development Plan, or a PDP with side-by-side images illustrating the two phases for clarity purposes. 4. Contact Anne.Warner@tucsonaz.gov for questions on landscape border. Zoning questions, please contact me at Elisa.Hamblin@tucsonaz.gov. |
06/02/2021 | LOREN MAKUS | ELECTRICAL ENGINEERING | REVIEW | Completed | 1. Site is in a balanced basin. As part of the rezoning, we will request the site be designed as if in a critical basin. 2. Coordinate with ADOT for impacts to ADOT highway. |